Clearview Home Improvements Complaints
The Ohio Department of Busline (ODOT) will authority an accessible abode accessible affair from 5 to 7 p.m. July 6 at Lehman Middle School, 1400 Broad Ave. N.W., in Canton.
["388"]The purpose of the affair is to present advice and accost accessible animadversion on proposed improvements at the Route 77 (I-77)/U.S. Route 62/State Route 687 (Fulton Road) altering and improvements on Fulton Road amid Clearview Avenue and the I-77 arctic exit/U.S. Route 62 eastbound access ramp.
Recommended busline improvements accommodate the following:
["485"]n Continue two lanes on U.S. Route 62 westbound aural the altering breadth and accommodate a concrete break amid the US Route 62 westbound cartage continuing on I-77 southbound and the U.S. Route 62 westbound cartage departure to Fulton Road;
n Widen the I-77 southbound avenue access to Fulton Road from two lanes to four lanes;
["465.6"]
n Widen the I-77 arctic avenue access to Fulton Road from two lanes to three lanes;
n Cul-de-sac Blake Avenue North adjoining to the I-77 southbound avenue access to Fulton Road;
["524.77"]
n Replace cartage signals and amend arresting timing on Fulton Road aural the activity limits; and
n Resurface Fulton Road from east of Clearview Avenue to the I-77 arctic exit/U.S .Route 62 eastbound access ramp, including accession of new pavement arrangement and signage and accessory barrier and bolt basin/drainage repairs.
["485"]The activity aggregation will be accessible to abode questions during the accessible abode accessible meeting. Exhibits illustrating the proposed improvements will be displayed. No academic presentation will be fabricated during the accessible house.
Written comments may additionally be submitted by Aug. 7 to: Brian Peck, Environmental Specialist, Ohio Department of Busline District 4, 2088 S. Arlington Road, Akron, OH 44306-4243 or Brian.Peck@dot.ohio.gov.
["485"]["388"]
["698.4"]